Sasol

“The project consisted of repair, replacement and addition to approximately 4 miles of roadway, drainage, and utilities in a heavy congested area and required extensive coordination with numerous entities. The entire scope was faced by numerous obstructions and obstacles and Barriere executed the entire project with safety and quality in the highest regards.”

Fluor Technip Integrated (FTI) Contract Manager, Sasol Project