This Project consists of several key tasks related to roadway and bridge construction. This project primarily includes rubblizing existing concrete pavement with a 4 lift asphalt overlay. Along with these operations, the project also consists of mill and asphalt overlay of existing lanes at interchanges, concrete bridge jacking with misc. associated bridge work, concrete pier protection, striping, signs/sign truss and miscellaneous electrical work.