I-10: French Branch Bridge – West Pearl River Bridge

PROJECT DETAILS

CLIENT

Louisiana Department of Transportation and Development

LOCATION

Slidell, LA

VALUE

$39.8M

WORK HOURS

125,395

SCOPE

The Louisiana Department of Transportation and Development (DOTD) contracted Barriere Construction Company, LLC to complete a $40 million road rehabilitation project to resurface almost 10 miles of interstate highway in eastern St. Tammany Parish, replacing worn faulted concrete pavement on Interstate 10 from the West Pearl River Bridge to the French Branch Bridge. Milling and asphalt leveling were also included to fix the substandard slopes on the project. Barriere completed other minor change orders including the adjustment of ITS boxes and the relocation of multiple signs. In total, the client added $745,000 of work to the project, but the savings Barriere generated through Value Engineering proposals covered this additional cost.

AWARDS

CUSTOMERS

TESTIMONIALS

“I would like to share my gratitude toward you and your entire team at Barriere Construction for all of the hard work and long hours required to successfully complete this $40M project ahead of schedule and under budget. In addition, I would like to compliment you and the others on the project management team for a job well done. Barriere Construction demonstrated their dedication to maintaining a trustworthy and committed relationship with the Department and Volkert (CE&I) to make this a successful partnering experience. This project is something to be proud of and I’m glad to be a part of it.”

Seth deArmas, P.E. LADOTD Project Coordinator, French Branch Project

LET BARRIERE BE YOUR SOLUTION

Get in touch to receive information or an estimate for your upcoming project.

JOIN THE
BARRIERE TEAM

Come join our team to make a difference in your community.