Turnkey installation of a 25’ tall, above-ground electrical vault for Entergy for the Mercedes-Benz Superdome. This involved driving piles, pouring the foundation, and constructing the split-face block walls. In addition, Barriere installed the bar joists, vent fans, and poured a concrete roof atop the vault.