GENERAL DEGAULLE CROSSING

Client: New Orleans Sewage & Water Board
Location: New Orleans, LA
Value: $20,092,796
($1.2 million savings)
Man Hours: 44,998 

 

Materials Used:
- 13000 cy of concrete
- 1,600,000 lbs of rebar
- 113000 sq feet of steel sheet pile
- 35000 cy of canal excavation
- 70000 linear ft of pre-cast concrete piling

 

Awards:
ABC Bayou
ABC Pelican
GNOBR
ENR
 
 

THE PROJECT

Barriere demolished each cross street, dug out the canal and installed 55’ wide and 11’ tall double barrel concrete box culvert, and then rebuilt the six cross streets over the recently re-engineered canal running on Gen. DeGaulle. Crews primarily worked in a large drainage ditch located between a set of sand dams that kept water out of the work area and routinely fought New Orleans’ weather to keep the work site dry. Barriere completed the difficult project with less than .001% of rework.